Standard Deviation
Green +/- 5%Accurate
Orange+/- 5% to +/- 10%Acceptable
RedAbove +/- 10%Requires Triage*
Table Result Key: Dashboard/JQL
Standard deviations of less than 10 percent can result from the data being one day stale, or in edge cases where an issue was moved in and out of a status multiple times. Greater deviations require investigation
 *triage required if the delta between Jira Validation Query and the report both numerically and proportionally large. Examples of non-triaged counts with greater than than +/-10%
  1. 6/5 has a delta of one issue, but is greater than the acceptable standard deviation

Report Name: Current Program Backlog Composition

Validation Date: 10/6/2022

Validator: Seth Evans/Randolph Anagho

TypesiQIESEQRSHQR
Infrastructure Enabler0/00/00/0
Architectural Enabler0/00/00/0
Exploration Enabler0/04/40/0
Compliance Enabler0/00/00/0
Enabler33/334/41/1
Features117/11753/53204/205

Table Result Key: Dashboard/JQL

NOTE: Updated report filter to include the following statuses to meet the report description (The number of ready and in progress features and enablers in the program backlog today.) Included statuses: "Ready for PI", "PI Ready", Implementing, "In Progress" 

HQR JQL: Project in ("HQR Program Project", "HQR UX-Men") AND issuetype in (10000, Enabler) AND Status in (Implementing, "PI Ready") ORDER BY issuetype ASC

EQRS JQL:

All features and enablers: Project = " End-Stage Renal Disease Quality Reporting System" AND issuetype in (10000, Enabler) AND Status in ("Ready for PI", "PI Ready", Implementing, "In Progress") ORDER BY status DESC

All Enablers: Project = " End-Stage Renal Disease Quality Reporting System" AND issuetype in (10000, Enabler) AND Status in ("Ready for PI", "PI Ready", Implementing, "In Progress") AND labels in (Enabler, Exploration_Enabler, Architectural_Enabler, Infrastructure_Enabler, Compliance_Enabler) ORDER  BY status DESC

IQIES JQL:

All features and enablers: Project in ("iQIES Program Board ", "iQIES Enigma", "iQIES HCD", "iQIES Frontiers", "iQIES Bohemian Rhapsody (DevOps)", "iQIES Dune (CLIA)", "iQIES FACT (Data and Backend)", "iQIES Outlander", "iQIES PA Reports", "iQIES QMIR Data", "iQIES SAS Viya / Dashboards", "iQIES S&C Reports", "IQIES SNOOPY", "iQIES Stargate", "iQIES Immeasurable", "iQIES The Misfits", "iQIES The Shop", "IQIES Woodstock")  AND issuetype in (10000, Enabler) AND Status in ("Ready for PI", "PI Ready", Implementing, "In Progress") ORDER BY status DESC

All Enablers: Project = "iQIES Program Board "  AND issuetype in (10000, Enabler) AND Status in ("Ready for PI", "PI Ready", Implementing, "In Progress") AND labels in (Enabler, Exploration_Enabler, Architectural_Enabler, Infrastructure_Enabler, Compliance_Enabler) ORDER  BY status DESC

Report: Current Program Backlog Health

Validation Date: 10/06/2022

Validator: Marc Santini

Comments: Overall good results. Egregious deviations are seen on low numbers as usual. Did data refresh and ruled out stale data. Investigation into iQIES errata needed

EQRS

Ready for PI15/150%
Analyzing (SAFe)2/20%
Refining6/60%
iQIES

Feature Definition4/40%
Feature Refinement2/366%
Feature Deep Dive5/771%
Story Definition74/751.2%
PI Ready86/851.2%
HQR

Refinement Backlog24/234.2%
Ready for Refinement33/330%
Analyzing (SAFe)31/310%
PI Ready89/881.2%



Report: Features in Status on PI start Date

Validation Date: 10/12/2022

Validator: Seth Evans

Validation Notes: I also revalidated iQies and EQRS. The previous results listed below are still valid. (Numbers for most recent PIs did change because they are active)

Legend: EazyBI count/JQL count

HQRPI 19PI 20PI 21PI 22PI 23
Funnel153/153138/138150/150146/146154/154
Refinement Backlog15/1515/1514/1412/1213/13
Ready for Refinement48/4869/6958/5853/5332/32
Analyzing SAFe7/64/413/1326/2631/31
PI Ready73/74102/10292/9291/91103/103
Implementing47/4852/5356/5764/6559/60

JQL: project  in ("HQR UX-Men", "HQR Program Project")  AND issuetype = 10000 AND Status was "PI Ready"  on ("2022-7-26 23:59")  - *Change status and date as applicable


Report: Features in Status on PI start Date

Validation Date: 8/15/2022

Validator: Marc Santini

Validation Notes:

  1. Issues with status changes to implementing were not being caught because the earlier status was being returned by the validation query. Changing the time from (YYYY-M(M)-D(D)) to ('YYYY-M(M)-D(D) HH:MM'), with "HH:MM" being "23:59" catches the status at 11:59 PM. This brought all counts well under the "Accurate" STD category
iQiesPI3PI4 PI5PI6PI7
Funnel160/156179/177175/173199/198299/300
Feature Definition1/13/35/56/64/4
Feature Refinement3/35/54/43/31/1
Feature Deep Dive8/811/114/418/1810/10
Story Definition84/8592/9254/5468/6852/52
PI Ready68/6859/59 84/8480/8082/82
Implementing57/5668/6869/6950/5050/50
EQRSPI 14PI 15PI 16PI 17PI 18
Funnel21/21125/125107/10784/84100/100
Analyzing (SAFe)0/00/03/33/33/3
Refining16/1613/1314/13*8/86/5*
Ready For PI0/09/917/1721/2225/25
Implementing5/512/1225/2529/2936/39

Validation Date : 8/11/2022

Validator:  Marc Santini

iQiesPI3PI4 PI5PI6PI7
Funnel160/156179/177175/173199/198299/302
Feature Definition1/13/35/56/64/4
Feature Refinement3/35/54/43/31/1
Feature Deep Dive8/811/114/418/1817/10
Story Definition84/8592/9254/7068/7352/55*
PI Ready68/6859/6584/9980/8282/88
Implementing57/5968/7269/7550/5050/50
EQRSPI 14PI 15PI 16PI 17PI 18
Funnel21/21125/125107/10784/84100/102
Analyzing (SAFe)0/00/03/33/33/3
Refining16/1613/1314/13*8/86/5*
Ready For PI0/09/917/1721/2225/27*
Implementing5/512/1225/2529/3336/38*

Report Name: Features Started and Closed per PI

Legend: EazyBI count/JQL count

Validation Date: 10/26/2022

Validator: Seth Evans

HQRPI 19PI 20PI 21PI 22
Implementing66/6698/9884/8486/86
Done51/5172/7252/52107/107

PI19: Project in ("HQR Program Project", "HQR UX-Men") AND issuetype = 10000 AND Status changed to Implementing during (2021-11-16, 2022-02-07) (change status to Done or Implementing)

PI20: Project in ("HQR Program Project", "HQR UX-Men") AND issuetype = 10000 AND Status changed to Implementing during (2022-02-08, 2022-05-02) (change status to Done or Implementing)

PI21: Project in ("HQR Program Project", "HQR UX-Men") AND issuetype = 10000 AND Status changed to Implementing during (2022-05-03, 2022-07-25) (change status to Done or Implementing)

PI22: Project in ("HQR Program Project", "HQR UX-Men") AND issuetype = 10000 AND Status changed to Implementing during (2022-07-26, 2022-10-17) (change status to Done or Implementing)

iQiesPI4 PI5PI6PI7
Implementing134/134122/122104/104104/104
Done135/13596/96115/11579/79


PI4: Project = "iQIES Program Board " AND issuetype = 10000 AND status changed to Done during (2021-10-13, 2022-01-18) (change status to Done or Implementing)

PI5: Project = "iQIES Program Board " AND issuetype = 10000 AND status changed to Done during (2022-01-19, 2022-04-19) (change status to Done or Implementing)

PI6: Project = "iQIES Program Board " AND issuetype = 10000 AND status changed to Done during (2022-04-20, 2022-07-19) (change status to Done or Implementing)

PI7: Project = "iQIES Program Board " AND issuetype = 10000 AND status changed to Done during (2022-07-20, 2022-10-11) (change status to Done or Implementing)


EQRSPI 16PI 17PI 18PI 19
Implementing36/3629/2921/2125/25
Done32/3231/3129/2934/34


PI16: Project = " End-Stage Renal Disease Quality Reporting System" AND issuetype = 10000 AND status changed to Done during (2021-10-13, 2022-01-18) (change status to Done or Implementing)

PI17: Project = " End-Stage Renal Disease Quality Reporting System" AND issuetype = 10000 AND status changed to Done during (2022-01-19, 2022-04-12) (change status to Done or Implementing)

PI18: Project = " End-Stage Renal Disease Quality Reporting System" AND issuetype = 10000 AND status changed to Done during (2022-04-13, 2022-07-05) (change status to Done or Implementing)

PI19: Project = " End-Stage Renal Disease Quality Reporting System" AND issuetype = 10000 AND status changed to Done during (2022-07-06, 2022-09-27) (change status to Done or Implementing)


***I added a bug LACE-3760 - Getting issue details... STATUS These numbers will need to be revalidated once the bug is resolved.***

10/26/22 While validating LACE-3760 it was found the time included in the date was causing issues to be dropped. Removing the time fixed the issue and resulted in the updated numbers logged above.


Validation Date : 8/17/2022

Validator: Marc Santini

Because The eazybi measure was using dateBetween with the actual PI start and end dates, it was not picking up items changed to the Implementing or Done statuses on the defined PI Start and End dates, because it was only looking for items in between those dates, not including them I updated the query to check After the the last minute of the day before the PI, and Before the first minute of the day following the PI. I updated the Eazybi measure and then changed the Jira query to use the BEFORE and AFTER operators rather than the DURING and used matching timestamps in both the measure and the query. I suspect that the DURING operator in Jira is not as high resolution as EazyBi's Datebetween function. 

I will create two stories to investigate the anomalous counts for iQIES PI 6 implementing, and EQRS PI 18 Done

Updated DateBetween function:  [Time].[Day].DateMembersBetween('Jan 18 2022 23:59', 'Apr 13 2022 00:01')
Updated Query:  Project = EQRS AND issuetype = 10000 AND Status changed to Done AFTER  ("2022-01-19 00:01")  AND Status changed to Done BEFORE  ("2022-04-13 00:01")
iQiesPI3PI4 PI5PI6PI7
Implementing104/104129/132123/122123/11383/85
Done196/196132/13597/97115/11516/17*


EQRSPI 14PI 15PI 16PI 17PI 18PI 19
Implementing16/1630/3036/3632/3221/2116/16
Done10/1025/2532/3233/3233/2919/19


Validation Date : 8/16/2022

Validator: Seth Evans

iQiesPI3PI4 PI5PI6PI7
Implementing104/104129/132105/122199/19873/83
Done196/196132/13593/96106/11316/16

Project = "iQIES Program Board "  AND issuetype = 10000 AND Status changed to Done during (2022-01-19, 2022-04-19)  ORDER BY key DESC

EQRSPI 14PI 15PI 16PI 17PI 18PI 19
Implementing16/1630/3036/3627/2918/2116/16
Done10/1025/2532/3227/3127/2919/19

Project = " End-Stage Renal Disease Quality Reporting System" AND issuetype = 10000 AND Status changed to Done during (2021-04-04, 2021-07-20) --Update status and dates of PI

Report Name: Work Delivered by Category per PI

Dashboard: CCSQ Program Dashboard

Validation Date: 9/7/22

Validator: Marc Santini

Validation Notes: iQIES numbers improved, all numbers within the "Accurate" standard deviation range!

EQRS numbers largely acceptable with a few outliers. I am curious as to why the average StDev jumped from 1% or less to ~5% starting in PI 17

Validation Queries

Validation Date: 8/31/2022

Validator: Seth Evans

iQIES

PI3PI4PI5PI6PI7

ChartJQL% DiffChartJQL% DiffChartJQL% DiffChartJQL% DiffChartJQL% Diff
Total190118801.10%18761894-0.96%18201840-1.10%18301832-0.11%810830-2.47%
Story126212451.35%12941315-1.62%14311450-1.33%13201325-0.38%621638-2.74%
Spike2222220.00%2122091.42%155158-1.94%1371342.19%6365-3.17%
Bug4174130.96%3703700.00%2342320.85%3763701.60%126127-0.79%
JQL Query:
PI3Project in ("iQIES Enigma", "iQIES HCD", "iQIES Frontiers", "iQIES Bohemian Rhapsody (DevOps)", "iQIES Dune (CLIA)", "iQIES FACT (Data and Backend)", "iQIES Outlander", "iQIES PA Reports", "iQIES QMIR Data", "iQIES SAS Viya / Dashboards", "iQIES S&C Reports", "IQIES SNOOPY", "iQIES Stargate", "iQIES Immeasurable", "iQIES The Misfits", "iQIES The Shop", "IQIES Woodstock")  AND issuetype in (Story, Spike, Bug) AND resolutiondate >= 2021-07-07 AND resolutionDate <= 2021-10-12
PI4Project in ("iQIES Enigma", "iQIES HCD", "iQIES Frontiers", "iQIES Bohemian Rhapsody (DevOps)", "iQIES Dune (CLIA)", "iQIES FACT (Data and Backend)", "iQIES Outlander", "iQIES PA Reports", "iQIES QMIR Data", "iQIES SAS Viya / Dashboards", "iQIES S&C Reports", "IQIES SNOOPY", "iQIES Stargate", "iQIES Immeasurable", "iQIES The Misfits", "iQIES The Shop", "IQIES Woodstock")  AND issuetype in (Story, Spike, Bug) AND resolutiondate >= 2021-10-13 AND resolutionDate <= 2022-01-18
PI5Project in ("iQIES Enigma", "iQIES HCD", "iQIES Frontiers", "iQIES Bohemian Rhapsody (DevOps)", "iQIES Dune (CLIA)", "iQIES FACT (Data and Backend)", "iQIES Outlander", "iQIES PA Reports", "iQIES QMIR Data", "iQIES SAS Viya / Dashboards", "iQIES S&C Reports", "IQIES SNOOPY", "iQIES Stargate", "iQIES Immeasurable", "iQIES The Misfits", "iQIES The Shop", "IQIES Woodstock")  AND issuetype in (Story, Spike, Bug) AND resolutiondate >= 2022-01-19 AND resolutionDate <= 2022-04-19
PI6Project in ("iQIES Enigma", "iQIES HCD", "iQIES Frontiers", "iQIES Bohemian Rhapsody (DevOps)", "iQIES Dune (CLIA)", "iQIES FACT (Data and Backend)", "iQIES Outlander", "iQIES PA Reports", "iQIES QMIR Data", "iQIES SAS Viya / Dashboards", "iQIES S&C Reports", "IQIES SNOOPY", "iQIES Stargate", "iQIES Immeasurable", "iQIES The Misfits", "iQIES The Shop", "IQIES Woodstock") AND issuetype in (Story, Spike, Bug) AND resolutiondate >= 2022-04-20 AND resolutionDate <= 2022-07-19 ORDER BY status DESC
PI7Project in ("iQIES Enigma", "iQIES HCD", "iQIES Frontiers", "iQIES Bohemian Rhapsody (DevOps)", "iQIES Dune (CLIA)", "iQIES FACT (Data and Backend)", "iQIES Outlander", "iQIES PA Reports", "iQIES QMIR Data", "iQIES SAS Viya / Dashboards", "iQIES S&C Reports", "IQIES SNOOPY", "iQIES Stargate", "iQIES Immeasurable", "iQIES The Misfits", "iQIES The Shop", "IQIES Woodstock") AND issuetype in (Story, Spike, Bug) AND resolutiondate >= 2022-07-20 AND resolutionDate <= 2022-10-11 ORDER BY status DESC



Report Name: Work Delivered by Category per PI

Dashboard : Enterprise Program Dashboard

Legend: EazyBI count/JQL count


iQIES

PI3PI4PI5PI6PI7

ChartJQL% DiffChartJQL% DiffChartJQL% DiffChartJQL% DiffChartJQL% Diff
Total190118801.10%18761894-0.96%18201840-1.10%18291832-0.11%810830-2.47%
Story126212451.35%12941315-1.62%14311450-1.33%13201325-0.38%621638-2.74%
Spike2222220.00%2122091.42%155158-1.94%1341340%6365-3.17%
Bug4174130.96%3703700.00%2342320.85%3753701.60%126127-0.79%


iQies numbers improved or stayed the same in all cases!


EQRSPI 15PI 16PI 17PI 18PI 19

Report
JQL 
StDev
Report
JQL
StDev
Report
JQL
StDev
Report
JQL
StDev
Report
JQL
StDev
Total
700699.02%731733.07%8588174.8%7817494.6%4785055.3%
Story
5675670%523527.08%6936614.7%6536293.8%3653865.4%
Bug
13113008%1931911.1%1541493%1171096.8%1071135.3%
Spike
220%880%6350%770%220%
Enabler000%770%440%6433.3%440%

I call this acceptable, although I am curious why the StDev jumped up to around 5% starting in PI 17. The high diffs are small issue counts and can be researched

PI5

Project in (EQRS, EQRSCI, EQRSD, EQRSARCH, EQRSEDSM, EQRSONBRD, EQRSMD, EQRSMS, EQRSPRTL) AND issuetype in(Story, Spike, Bug, Enabler) AND resolutiondate >= 2021-07-20 AND resolutionDate <= 2021-10-12

PI6Project in (EQRS, EQRSCI, EQRSD, EQRSARCH, EQRSEDSM, EQRSONBRD, EQRSMD, EQRSMS, EQRSPRTL) AND issuetype in(Story, Bug, Spike, Enabler) AND resolutiondate >= 2021-10-13 AND resolutionDate <= 2022-01-18
PI7Project in (EQRS, EQRSCI, EQRSD, EQRSARCH, EQRSEDSM, EQRSONBRD, EQRSMD, EQRSMS, EQRSPRTL) AND issuetype in(Story, Spike, Bug, Enabler) AND resolutiondate >= 2022-01-19 AND resolutionDate <= 2022-04-12
PI8Project in (EQRS, EQRSCI, EQRSD, EQRSARCH, EQRSEDSM, EQRSONBRD, EQRSMD, EQRSMS, EQRSPRTL) AND issuetype in(Story, Spike, Bug, Enabler) AND resolutiondate >= 2022-04-13 AND resolutionDate<= 2022-07-05
PI9Project in (EQRS, EQRSCI, EQRSD, EQRSARCH, EQRSEDSM, EQRSONBRD, EQRSMD, EQRSMS, EQRSPRTL) AND issuetype in(Story, Spike, Bug, Enabler) AND resolutiondate >= 2022-07-06 AND resolutionDate<= 2022-09-27

Report Name: IQies Project data in "All ART Teams"

Dashboard: iQIES All ART Teams dashboard

Legend: JQL/Easy BI

Validation Date: 9/08/2022

Validator: Randolph Anagho


JQL/Dashboard 

IQIESPI 3PI 4PI 5PI 7
Stories951/1067956/9531124/1115179/155
Bugs290/347291/291180/182102/92
Enablers0/00/00/00/0
Spikes185/213157/157127/12626/24

Report Link: PI 4 All ART Teams IQIES Test Report - Issues - LACE Metrics Development - eazyBI (cms.gov)

Jira Query



PI 3Project in ("iQIES Enigma", "iQIES HCD", "iQIES Frontiers", "iQIES Bohemian Rhapsody (DevOps)", "iQIES Dune (CLIA)", "iQIES FACT (Data and Backend)", "iQIES Outlander", "iQIES PA Reports", "iQIES QMIR Data", "iQIES SAS Viya / Dashboards", "iQIES S&C Reports", "IQIES SNOOPY", "iQIES Stargate", "iQIES Immeasurable", "iQIES The Misfits", "iQIES The Shop", "IQIES Woodstock") AND issuetype in (Spike, Story, Enabler, Bug) AND created >= 2021-7-20 AND created <= 2021-10-12 AND status was in (Done, Closed, Done, "Production Ready")
PI 4Project in ("iQIES Enigma", "iQIES HCD", "iQIES Frontiers", "iQIES Bohemian Rhapsody (DevOps)", "iQIES Dune (CLIA)", "iQIES FACT (Data and Backend)", "iQIES Outlander", "iQIES PA Reports", "iQIES QMIR Data", "iQIES SAS Viya / Dashboards", "iQIES S&C Reports", "IQIES SNOOPY", "iQIES Stargate", "iQIES Immeasurable", "iQIES The Misfits", "iQIES The Shop", "IQIES Woodstock") AND issuetype in (Spike, Story, Enabler, Bug) AND created >= 2021-10-13 AND created <= 2022-1-14 AND status was in (Done, Closed, Done, "Production Ready")
PI 5Project in ("iQIES Enigma", "iQIES HCD", "iQIES Frontiers", "iQIES Bohemian Rhapsody (DevOps)", "iQIES Dune (CLIA)", "iQIES FACT (Data and Backend)", "iQIES Outlander", "iQIES PA Reports", "iQIES QMIR Data", "iQIES SAS Viya / Dashboards", "iQIES S&C Reports", "IQIES SNOOPY", "iQIES Stargate", "iQIES Immeasurable", "iQIES The Misfits", "iQIES The Shop", "IQIES Woodstock") AND issuetype in (Spike, Story, Enabler, Bug) AND created >= 2022-1-19 AND created <= 2022-4-19 AND status was in (Done, Closed, Done, "Production Ready")
PI 7Project in ("iQIES Enigma", "iQIES HCD", "iQIES Frontiers", "iQIES Bohemian Rhapsody (DevOps)", "iQIES Dune (CLIA)", "iQIES FACT (Data and Backend)", "iQIES Outlander", "iQIES PA Reports", "iQIES QMIR Data", "iQIES SAS Viya / Dashboards", "iQIES S&C Reports", "IQIES SNOOPY", "iQIES Stargate", "iQIES Immeasurable", "iQIES The Misfits", "iQIES The Shop", "IQIES Woodstock") AND issuetype in (Story, Spike, Enabler, Bug) AND created >= 2022-7-20 AND created <= 2022-10-11 AND status was in (Done, Closed, Done, "Production Ready")


EQRSPI 15PI 16PI 17PI 18PI 19

Report
JQL 
StDev
Report
JQL
StDev
Report
JQL
StDev
Report
JQL
StDev
Report
JQL
StDev
Total
700699.02%731733.07%8588174.8%7817494.6%4785055.3%
Story
5675670%523527.08%6936614.7%6536293.8%3653865.4%
Bug
13113008%1931911.1%1541493%1171096.8%1071135.3%
Spike
220%880%6350%770%220%
Enabler000%770%440%6433.3%440%


I call this acceptable, although I am curious why the StDev jumped up to around 5% starting in PI 17. The high diffs are small issue counts and can be researched

PI5

Project in (EQRS, EQRSCI, EQRSD, EQRSARCH, EQRSEDSM, EQRSONBRD, EQRSMD, EQRSMS, EQRSPRTL) AND issuetype in(Story, Spike, Bug, Enabler) AND AND status was in (Done, Closed, Done, "Production Ready") resolutiondate >= 2021-07-20 AND resolutionDate <= 2021-10-12

PI6Project in (EQRS, EQRSCI, EQRSD, EQRSARCH, EQRSEDSM, EQRSONBRD, EQRSMD, EQRSMS, EQRSPRTL) AND issuetype in(Story, Bug, Spike, Enabler) AND resolutiondate >= 2021-10-13 AND resolutionDate <= 2022-01-18
PI7Project in (EQRS, EQRSCI, EQRSD, EQRSARCH, EQRSEDSM, EQRSONBRD, EQRSMD, EQRSMS, EQRSPRTL) AND issuetype in(Story, Spike, Bug, Enabler) AND resolutiondate >= 2022-01-19 AND resolutionDate <= 2022-04-12
PI8Project in (EQRS, EQRSCI, EQRSD, EQRSARCH, EQRSEDSM, EQRSONBRD, EQRSMD, EQRSMS, EQRSPRTL) AND issuetype in(Story, Spike, Bug, Enabler) AND resolutiondate >= 2022-04-13 AND resolutionDate<= 2022-07-05
PI9Project in (EQRS, EQRSCI, EQRSD, EQRSARCH, EQRSEDSM, EQRSONBRD, EQRSMD, EQRSMS, EQRSPRTL) AND issuetype in(Story, Spike, Bug, Enabler) AND resolutiondate >= 2022-07-06 AND resolutionDate<= 2022-09-27

Report Name: Feature Cumulative Flow

Dashboard: CCSQ Program Dashboard

Validation Date: 10/27/2022

Validator: Seth Evans

Program: HQR

Legend: JQL/Easy BI

Status10/26/2204/29/2211/10/21
Implementing71/7054/5341/40
PI Ready73/73105/10590/89
Analyzing SAFe40/4013/136/7
Ready for Refinement35/3559/5942/42
Refinement Backlog11/1114/1416/16
Funnel145/145146/146149/149

JQL (change status as needed)

10/26/22 - Project in ("HQR Program Project", "HQR UX-Men") AND issuetype = 10000 AND Status = "Refinement Backlog"

4/29/22 - Project in ("HQR Program Project", "HQR UX-Men") AND issuetype = 10000 AND status was "PI Ready"  ON endOfDay(-181)

11/10/21 - Project in ("HQR Program Project", "HQR UX-Men") AND issuetype = 10000 AND status was "PI Ready"  ON endOfDay(-351)


**Modified the available statuses to only use the statuses that the 3 programs are using (removed the groupings that were used)

ProgramsStatus


iQIESBacklog
EQRSHQRiQIESFunnel

HQR
Refinement Backlog
EQRSHQR
Ready for Refinement
EQRSHQR
Analyzing Safe


iQIESFeature Definition
EQRS

Refining


iQIESFeature Refinement


iQIESFeature Deep Dive


iQIESStory Definition

HQRiQIESPI Ready
EQRS

Ready for PI
EQRSHQRiQIESImplementing
  • No labels