Host: Louis Fouejieu and Seth Evans 

Original Story:

As an EQRS program manager, in order to start preview period, I want reports to be in production environment. 

Acceptance criteria

  • QIP Reports run in production
  • Able to view reports in Prod
  • The two new measures (PPPW & MedRec) are viewable in UI via Prod env
  • Target is to receive final Preview Period data on October 28 under assumption that preview period starts on 11/8
  • Added to 16.2 sprint 

**NOTE - Need to edit tasks below to align with CI's needs**


Revised Story:


As a Facility Manager/Program Manager of the clinic, I want reports(PLR, PSR, PSSR) to be available and accessible in a production environment so that EQRS Program Manager can validate the accuracy of the data before the preview period is started.


Acceptance criteria

  • Verify that QIP Reports (PLR, PSR, PSSR) are available and accessible in production by EQRS team members on 10/28
  • Verify that QIP Reports (PLR, PSR, PSSR) are not available for the end-users (FM/PMC) until 11/18
  • Verify that the two new measures (PPPW & MedRec) are viewable in UI via Prod env for the 3 reports (PLR, PSR, PSSR)
  • Verify that QIP Reports (PLR, PSR, PSSR) can be downloaded
  • Verify that the two new measures (PPPW & MedRec) are viewable on the downloaded copy for the 3 reports (PLR, PSR, PSSR)


**NOTE - Need to edit tasks below to align with CI's needs**

  • Target is to receive final Preview Period data on October 28 under assumption that preview period starts on 11/18
  • Added to 16.2 sprint 