Page tree

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 11 Next »

Standard deviations of less than 10 percent can result from the data being one day stale, or in edge cases where an issue was moved in and out of a status multiple times. Greater deviations require investigation

Standard Deviation
Green +/- 5%Accurate
Orange+/- 5% to +/- 10%Acceptable
RedAbove +/- 10%Requires Triage*
 *triage required if the delta between Jira Validation Query and the report both numerically and proportionally large. Examples of non-triaged counts with greater than than +/-10%
  1. 6/5 has a delta of one issue, but is greater than the acceptable standard deviation

Validation Date: 8/15/2022

Validation Notes:

  1. Issues with status changes to implementing were not being caught because the earlier status was being returned by the validation query. Changing the time from (YYYY-M(M)-D(D)) to ('YYYY-M(M)-D(D) HH:MM'), with "HH:MM" being "23:59" catches the status at 11:59 PM. This brought all counts well under the "Accurate" STD category
iQiesPI3PI4 PI5PI6PI7
Funnel160/156179/177175/173199/198299/300
Feature Definition1/13/35/56/64/4
Feature Refinement3/35/54/43/31/1
Feature Deep Dive8/811/114/418/1810/10
Story Definition84/8592/9254/5468/6852/52
PI Ready68/6859/59 84/8480/8082/82
Implementing57/5668/6869/6950/5050/50
EQRSPI 14PI 15PI 16PI 17PI 18
Funnel21/21125/125107/10784/84100/100
Analyzing (SAFe)0/00/03/33/33/3
Refining16/1613/1314/13*8/86/5*
Ready For PI0/09/917/1721/2225/25
Implementing5/512/1225/2529/2936/39

Validation Date : 8/11/2022

iQiesPI3PI4 PI5PI6PI7
Funnel160/156179/177175/173199/198299/302
Feature Definition1/13/35/56/64/4
Feature Refinement3/35/54/43/31/1
Feature Deep Dive8/811/114/418/1817/10
Story Definition84/8592/9254/7068/7352/55*
PI Ready68/6859/6584/9980/8282/88
Implementing57/5968/7269/7550/5050/50
EQRSPI 14PI 15PI 16PI 17PI 18
Funnel21/21125/125107/10784/84100/102
Analyzing (SAFe)0/00/03/33/33/3
Refining16/1613/1314/13*8/86/5*
Ready For PI0/09/917/1721/2225/27*
Implementing5/512/1225/2529/3336/38*
TypesiQIESEQRS
Infrastructure Enabler1/10/0
Architectural Enabler1/10/0
Exploration Enabler1/019/19
Compliance Enabler2/20/0
Enabler91/908/8
Features499/426130/62

Report Name: Features Started and Closed per PI

Legend: EazyBI count/JQL count

iQiesPI3PI4 PI5PI6PI7
Implementing104/104129/132105/122199/19873/83
Done196/196132/13593/96106/11316/16

Project = "iQIES Program Board "  AND issuetype = 10000 AND Status changed to Done during (2022-01-19, 2022-04-19)  ORDER BY key DESC

EQRSPI 14PI 15PI 16PI 17PI 18PI 19
Implementing16/1630/3036/3627/2918/2116/16
Done10/1025/2532/3227/3127/2919/19

Project = " End-Stage Renal Disease Quality Reporting System" AND issuetype = 10000 AND Status changed to Done during (2021-04-04, 2021-07-20) --Update status and dates of PI


  • No labels