Date

Attendees

Name
Aaron Thompsonx
Adrienne Adkins
Adrienne Ray

Ahmar Wazir


Andrew Yochum
Anitha Chintalapatix
Arnie Espartero
Betina Fletcher
Branon Barrettx
Cheri Jergerx
Chris Brownx
Christopher King
Curt Phillipsx
Deb Wilson
Greg Ecclestonx
Hari Krishnax
Heather Moore
Howard Thomasx
Jason Bullock
Jason Clemx
Jennifer Bailey
Justyna Sardin
Karena Sullivan
Kataiah Ravipati
Kathleen Prewittx
Kelly Llewellyn
Lakshmi Eriginenix
Leah Skien
Lisa Rees
Lonnie Hanekamp
Melissa Fieldhousex
Michael Kennedyx
Nana Aidoox
Nathan Muzosx
Ozlem Taselx
Pandu Mudda
Patrick McConnell
Preston Brownx
Revathy Ramakrishnax
Scott Laughlinx
Tim Jacksonx
Seema Sreenivasx
Sarah Fillingx
Shamim Almamunx
Tom Lantz
Vladimir Ladikx
Yvette Brownx
Shalon Quinnx




Agenda

ItemsWho

Phase 3 Testing Timeline

Scott L.
  • 06/09/2021 - 07/06/2021 EDIs performs integration testing.
  • 07/06/2021 EDIs sign-off on integration testing - Phase 3 (Clinical Codes/2728).
  • Timeline
Data Cleanup InitiativeMichael Kennedy
  • Working through tickets; we are in steady state and are prepared for 07/12/2021
  • We appreciate the collaboration with the EDI Submitters
Reported IssuesYvette
  • 06/28/21:  orgfacilitycode is missing in the response files where the crownFacilityId is populated. Ticket [CS1339567 ] is opened
    • This has been corrected and will be deployed when the Phase 3 codes are deployed to Production
  • Feedback files not received for all submissions
    • Database issue was corrected
  • 99999 errors
    • Environmental issue unrelated to the Phase 3 validation work; remediation is in progress and will be completed by 7/12/2021
Round tableScott L.

ICH CAHPS attestations and Clinical Depression can be tested in Prod Preview, but not considered in decision-making

Davita

    • Concerns around timeline and Clinical Compliance report availability (accuracy, prerequisite)
    • Never received any reporting on Clinical Depression 

FKC  

    • Foresees no issues for sign-off
    • Clinical Compliance report availability (accuracy, prerequisite)

DCI 

    • Foresees no issues
    • Clinical Compliance report availability (accuracy, prerequisite)

NRAA 

    • Testing is inadequate
    • Volume testing is not complete
    • Cannot support the timeline at this time
    • Clinical Compliance report availability (accuracy, prerequisite)

Note: Support Center resources during submission window are in place. When reporting issues, use key words "2020 Clinical Submission" or "URGENT" to ensure quick response.

  • Proposed Submission Plan for 2020
Scott/Lakshmi/YvetteProposed Submission Plan for 2020 Clinical Months

Next meeting scheduled for  


  • Next EDI Submission Testing Meeting


Action Items:

  • EDI Submitters will review Proposed Submission Plan for 2020 Clinical Months and adjust it as appropriate
  • Shalon Quinn will report back on increased NCC production of the Clinical Compliance report
  • user-8ce96 Provide support center feedback loop to EDI Submitters during submission period as first indicator of material issues



DateMilestone (M) / Task (T)DescriptionPhaseStatus
2/28/2021MCode deployed to pre-prod for testing.1Complete
3/15/2021 - 3/24/2021TEDIs perform integration testing.1Complete

3/24/2021

MEDIs sign-off on integration testing.1Complete

3/24/2021 - 3/25/2021

TADO prepares for coding deployment.1Complete

3/25/2021

MProduction deployment.1Complete
3/31/2021MProd-Preview environment contains refreshed prod data 2Complete
2/24/2021 - 3/10/2021 TReview of phase 2 codes and finalize list of codes.  Complete
3/11/2021 - 4/30/2021TADO perform coding updates and regression testing - Phase 2 (Patient Codes) 2Complete

4/30/2021

MProd-Preview environment data refresh.2Complete

5/3/2021

MRemaining Phase 2 (Patient Codes) deployed to pre-prod for testing.2Complete

5/4/2021 - 6/1/2021

T

EDIs performs integration testing - Phase 2 (Patient Codes) 
Starting 5/4 - EDIs submit prod file in prod environment and PP2-3.  This should be the SAME file for both environments.  Review discrepancies between the feedback files and validate codes.

2Complete

6/2/2021

MEDIs sign off-on integration testing - Phase 2 (Patient Codes) 2Complete

6/2/2021 - 6/4/2021

TADO prepares for coding deployment - Phase 2 (Patient Codes) 2Complete

6/3/2021

MProduction deployment - Phase 2 (Patient Codes) 2Complete
6/4/2021MPhase 2 (Patient Codes) live in production.2Complete
3/10/2021 - 3/17/2021TReview of phase 3 codes and finalize list of codes.  3Complete
5/12/2021 - 06/08/2021TADO perform coding updates and regression testing - Phase 3 Clinical Codes/27283Complete

6/4/2021

MProd-Preview environment data refresh.
Complete
6/4/2021 - 6/6/2021T

EDIs SHOULD NOT submit any PATIENT files during this time period in production (to ensure same patients are in PP2-3).

3Complete
6/7/2021T

EDIs to drop file into PP2-3 to establish a baseline.

3Complete

6/8/2021

MCode deployed to pre-prod for testing - Phase 3 (Clinical Codes/2728).
Reopening September 2020 to March 2021 Clinical months for submission.
3Complete

6/9/2021 - 7/6/2021

TEDIs performs integration testing.

Starting 6/9 - Re-drop same file from 6/7/2021 into PP2-3.  Review feedback files from PP2-3 and validate codes.

3Complete

7/6/2021

MEDIs sign-off on integration testing - Phase 3 (Clinical Codes/2728).3

Complete

7/7/2021 - 7/11/2021

TADO prepares for coding deployment - Phase 3 (Clinical Codes/2728).3Complete
7/12/2021MPhase 3 (Clinical Codes/2728) live in production.3Complete

7/12/2021

MEDSM Implementation Complete (Phase 1 - 3).n/aComplete

7/12/2021 - 9/15/2021




T

Resubmission of Clinical Data Files (September to December). 

Open July 12, 2021 at 5 a.m. Pacific (8 a.m. Eastern) and close September 15, 2021 at 11:59 p.m. Pacific Daylight Time

9/15/2021 is the official closure date for the clinical months of September, October, November, and December 2020.

CMS highly recommends completing large data submissions prior to the official clinical closure date.


n/a

Complete


9/15/2021


M

Data fully submitted and ready for measure and scoring calculations.



n/aComplete
09/20/2021 - 02/28/2022T

Submit January-September 2021 EQRS Clinical Data, ICH CAHPS Attestations, and Clinical Depression Screening and Follow-Up Plan reporting in EQRS. Additionally, all subsequent months in 2021 will open for data submission on the first day of each month (i.e., October opens October 1; November opens November 1; and December opens December 1). 

n/a
02/28/2022MThe clinical closure date for all months in 2021 is February 28, 2022 at 11:59 PM PT.n/a

Data Submission (Errors & Warnings) Milestone Dates - By Phase


Phase No.

File Type

Code Bucket Name

Codes

ADO Completion Date

LDO Testing Start Date

Testing Completion Date

Production Date

1

Patient

Admit Reasons

11221, 11222, 11223, 11224, 11225

2/24/2021

3/1/2021

3/24/2021

3/25/2021

2

Patient

Patient Codes


5/3/2021

5/4/2021

6/1/2021

6/7/2021

3

Clinical

Clinical Codes


6/8/2021

6/9/2021

7/6/2021

7/12/2021

3

2728

2728 Codes


6/8/2021

6/9/2021

7/6/2021

7/12/2021