CCSQ D&A Townhall |
---|
Date | Thursday, October 27, 2022 at 1:00 pm ET |
Agenda | - CCSQ Data Camp Agenda Review
- Monthly User Experience Survey
- System Updates
- SAS Via Issues
- iQIES Data Issue
- Maintenance Schedule
- Data Source and Usage Updates
- Known Issues
- Reference Code Data - Zoom Poll
- CSAT Update
- CDR Persistent Storage Migration Update
- Q&A
|
CCSQ Data Camp Agenda Review | Day One – November 16th - 12:45 pm ET – Kick Off
- 1:00 pm ET – CCSQ Data & Analytics Notebook Alternative (two-hour session)
- 3:00 pm ET – Meet the CMS Data Scientists
- 4:00 pm ET – CCSQ Data & Analytics Roadmap & Vision
Day Two – November 17th - 12:00 pm ET – Understanding the CCSQ Data & Analytics Environment
- 1:00 pm ET – Utilizing Qualitative Analysis
- 2:00 pm ET – Unique Data Use Cases
- 3:00 pm ET – Feedback Analysis System (FAS) Overview
- 4:00 pm ET – CCSQ QuickSight Overview
- 4:55 pm ET – Data Camp Wrap Up
Session Information can be found here on Confluence. For those who do not have the invitation, contact us at servicecentersos@cms.hhs.gov |
System Updates | Lagging Issues:- Issue Description: SAS Viya users have reported intermittent lagging and freezing while utilizing the application.
- Resizing efforts have taken place during the September 9th maintenance event to improve SAS job processing times
iQIES Data Issue:- Issue Description: The SNF Providers have not been updated in the assessment_iqies schema after the most recent refresh on 10/19. The latest entry for the sys_ld_id column in the natl_facility_mds table is September 26, 2022
- Workarounds:
- For federally certified providers, users can join to the csp_prvdr_cmn table
- For CDR reporting, the csp_prvdr_cmn table would be the preferred table for nursing home provider demographics. All MDS records should be joined to that table.
- Resolution: There is a fix in the backlog but the iQIES team needs confirmation from CMS before table updates are made, which is expected in the November 1st data refresh
Scheduled Maintenance Events:All events will begin at 8:00 pm ET and end approximately at 11:00 pm ET. Some events may require longer time, in which case users will be notified separately. A communication will be sent out once maintenance is complete. As a reminder, whenever there is maintenance on the environment, you will need to make sure all of your code and table changes are saved. |
Data Source and Usage Updates | QMARS Longer Text Fields - 1/12/2021- Workaround: Consider using healthcare_service_qmars_ng if your DUA supports it
- Final Actions Claims Discrepancy – 09/19/2022
- Final Actions in Claims data may change over time, as data refreshes will update Final Actions value in historical data
- Recommendation: If you responded to the recent survey that you are impacted by this issue, please create a helpdesk ticket so that we can work with you directly
|
CSAT Updates | - The D&A and DVA Teams collaborated to produce the May-September CSAT delivery for maturities 2 and 5
- The team ran QA following each step of the CSAT process to ensure that the results were valid
- The team is on track to produce the October CSAT delivery by COB 10/28
Parallel Runs - Parallel runs through the pre-process and main CSAT steps to verify that the results match exactly
Automated QA - Record counts in pre-processing to validate accurate data
- Record counts during resizing (compression) to validate the final record counts, prior to publishing
Manual QA - Manually analyze the row counts for a sample set of output tables, to track metrics like percent variance and seasonality, by comparing with the CSAT output of previous months.
- A historical report for 5 selected states (AK, CA, TX, VA and KS) is used for this purpose. This ensures that the table counts fall between the permissible range.
- If any outliers exist in table growth rates from month-to-month, check for the possibility of any duplicate values or re-create the table by executing the specific CSAT step again.
- A comparison of the unique number of claims is performed between the corresponding ABASE and ARVC tables and BBASE and BLINE tables to confirm that no data is lost or incomplete.
|
CDR Persistent Storage Migration Update | Data & Analytics Team has completed reaching out to CDR users to migrate legacy hive data sets from HDFS to S3 Benefits: - Frees up disk space within CDR Cluster
- S3 storage provides unlimited capacity, better persistence, and lifecycle capabilities
- Supports future migrations of CDR Architecture to better alternatives
Dependency: Data & Analytics will depend on teams for coordination and validation of migrated data sets
Migration has been completed in phases with multiple groups at a time - Phase 0: X-small databases (up to 100 GBs) – Completed
- Phase 1: Small databases (100 GBs-1TB) – Completed
- Phase 2: Medium databases (1-3 TBs) – Completed
- Phase 3: Large databases (3-10 TBs) – Completed
- Phase 4: X-large databases (10+ TBs) – Completed
|
Q&A | - Does the resize/more disk space impact all queues (heavy and norm) and SPRE?
A - No impact. It will add more SPRE resources. 2. What is the expected timeline for fixing the historical final action claims issue? A - No resolution date at the moment.
3. Are we expecting CSAT to be updated tomorrow (10/28)? A - CSAT is in progress. We want to validate the results. It will be available by Monday at the latest. 4. Is there any update on the Notebook alternative to Zeppelin? A - The pilot is completed, waiting on further direction from CMS. 5. When should we expect zeppelin to no longer be available? A - It is dependent on the Notebook decision. |